21-04927 ELW Heat Recovery Coil Installation
ELW – All Rooms
Air Handler Verification Shutdown
FMGT and Rain City Technical are working to install energy saving heat recovery coils on all air handlers in the Engineering Lab Wing.
In support of this work, we will be performing a system verification. This will require us to briefly shut down each air handler to verify its components.
This will result in a temporary loss of make up air for fume hoods and irregular containment. During this time frame, fume hoods sashes should remain closed.
Wednesday, November 5th, 9:30 am to 1:00 pm
View/Download Facilities Notice: 21-04927 ELW Heat Recovery Coil Installation
Contact/Organizer Name: Jen Miley, Project Manager
Contact/Organizer Email address: jmiley@uvic.ca