This website stores cookies on your computer. These cookies are used to collect information about how you interact with our website and allow us to remember your browser. We use this information to improve and customize your browsing experience, for analytics and metrics about our visitors both on this website and other media, and for marketing purposes. By using this website, you accept and agree to be bound by 糖心视频鈥檚 Terms of Use 蹿辞谤听web and social media privacy.聽聽If you do not agree to the above, you can configure your browser鈥檚 setting to 鈥渄o not track.鈥�

Skip to main content

Consulting for 糖心视频

The Consultant Information Package acts as an initial orientation guide for architects, engineers, designers and other consultants working with 糖心视频 and Facilities Management (FMGT).

This page is based on that document, but is condensed, simplified and reformatted for viewing on mobile devices. It's not meant to replace the document, but to supplement it as a quick reference guide.

The campus

The 糖心视频 campus comprises over 360,000 square metres of floor space, more than 240 buildings, and over 400 acres. The campus civil infrastructure includes utilities systems: heating, electrical, water distribution, storm and sanitary systems as well as roadways and parking lots. The campus also enjoys a large natural forested area and the expansive Finnerty Gardens.

Regulatory bodies

The University Act and the Government of British Columbia

糖心视频 is constituted under the Universities Act as an independent agency of the crown. It operates under the authority of its own Board of Governors. Note:

  • Operating budgets and capital funds are provided by the province.
  • The Ministry of Advanced Education and the Ministry of Finance oversee 糖心视频.

The Corporation of the District of Oak Bay and The District of Saanich

The campus is split between municipalities with the north and east sides in Saanich and the south and west sides in Oak Bay. Read more about municipal planning and development regulations. Note:

  • The BC Building Code and the Fire Code are applied on projects, including the requirements for Schedules from Registered Professionals as part of the permitting process.
  • Building Permits are required from the respective municipalities.
  • FMGT will authorize the Prime Consultant to Act as Agent on 糖心视频 behalf.
  • FMGT will pay for and pick up Building Permits once approved.
  • Evidence of applicable permits and approvals must be posted at the site.

糖心视频 Campus Lands

  • Parcel Identifier (PID): 018-583-890
  • Lot 1, Sections 31, 44, 45, 71 and 72, Victoria District
  • Registered Plan Number: VIP 57957

Gordon Head/Ian Stewart Complex

  • 3964 Gordon Head Road
  • Parcel Identifier (PID): 002-064-987
  • Lot 1, Plan 28318, Section 60, Victoria District

Standards

糖心视频 has established standards and specifications both for physical design and construction and drawings and documentation related to projects. Consultants and contractors must follow these standards in their work for 糖心视频.

Sustainability

We work in accordance with the 糖心视频 Climate & Sustainability Action Plan 2030 (CSAP). We aim to construct, renovate, maintain and operate campus buildings to green building standards and practices.

All new buildings and additions will achieve the standard of  Gold certification or equivalent. We also aim to:

  • design and construct green building projects that meet the highest environmental standards as project budget allows
  • select environmentally preferable products whenever feasible
  • design to minimize waste (water, material and energy waste) using integrated design of systems
  • optimize and manage water use 

Interaction with 糖心视频 departments

FMGT is responsible for identifying and retaining registered professionals and other consultants needed for the design and execution of the project.

糖心视频 departments are often consulted for detailed requirements and approvals. All communication with these departments must be coordinated through your FMGT Representative.

糖心视频 role & consultant team

For work on the Gordon Head campus, FMGT will engage qualified professionals for:

  • structural
  • architectural
  • mechanical
  • electrical
  • civil
  • life safety systems designs

Additional specialized consultants, such as acoustic or hazardous materials, may also be engaged depending on the requirements of the project. Changes to the contract must be reviewed by all consultants before submitting the proposed Change Order to the FMGT Representative for final acceptance. You can find more information on how to submit a Change Order on our administration page.

Only 糖心视频 can approve an equivalent or alternate product. Only 糖心视频 can approve a Change Order. If an architect is the prime consultant on a project, they are required to be the Payment Certifier.

Consultants must prepare drawings and specifications for acceptance, written approval and sign off by the FMGT Representative.

Consultants shall familiarize themselves with all of the relevant regulations applicable to the design, construction, use of material and operation of the premises. This includes:

  • BC Building Code
  • amended National Building Code
  • Fire Code
  • all applicable Occupational Environmental Regulations

The design of the improvements must comply with these and all other relevant regulations, including our facilities and infrastructure technical standards (FITS) document and signage standards.

Administration

Get contract and accounting administration support.